COMMERCIAL/INDUSTRIAL
FACING
AND CAPSHEET APPLICATIONS FOR PANELIZED WOOD ROOF SYSTEMS
Installation
Method (figure 1):
1.
Secure facing to the inside of sub purlin by stapling no more than 6"
apart (3 to 4" on Gymguard or Arenashield). Let facing hang down and
proceed to next step.
2.
Friction fit batt insulation (it may be necessary to tack with staples to
sub purlins).
Note:
It is not necessary to wire up insulation, a facing with a tensile
strength of 30 lbs./inch width (both MD and
XD) or greater, is strong enough to hold batt in place.
3.
Pull facing over batt and staple to the inside of adjoining bay then
repeat steps 1, 2 & 3.
Installation
Method (figure 2):
1.
Secure one side of material to face of sub-purlin stapling no more
than 6" apart(3 to 4" on Gymguard or Arenashield).
2.
Staple opposite side by pulling one corner tight and then staple.
3.
Pull opposite corner, staple, then staple entire side. (Repeat steps 1, 2
& 3)
Installation
Note: Length and width of facing will vary depending on truss
type and sub-purlin size.
|